Description of Options
Description of options
4
■
Options
(continued)
P30
Interface drawing approval
When this option is ordered, the customer will receive a set of
drawings associated with control and interfaces for approval,
four weeks after clarification of the order checklist in the factory.
The submitted drawings include:
•
Dimension (outline) drawings
•
Interconnection (interface) diagram
•
Circuit diagram
These drawings will be submitted in the standard format of the
factory.
Change requests must be received by the factory no later than
two weeks after submittal of the approval drawings, otherwise
changes will incur chargeable costs and the confirmed delivery
date will have to be revised. Possibly required drawing changes
will be executed by the factory within two weeks after receipt of
a change request.
Drawings associated with long lead materials will not be submit-
ted for approval. Siemens will order such materials – without cus-
tomer approval – right away. Changes that affect such materials
will always incur chargeable costs.
Note:
This option does not cause a hold point in order processing.
P31
Complete drawing approval
When this option is ordered, the customer will receive a com-
plete set of drawings for approval, six weeks after clarification of
the order checklist in the factory.
The submitted drawings include:
•
Dimension (outline) drawings
•
Interconnection (interface) diagram
•
Circuit diagram
•
Arrangement diagram
•
Electrical data sheet
•
Quality Control Plan
•
Inspection & Test Plan
These drawings will be submitted in the standard format of the
factory.
Until the customer has declared his final approval of the
drawings in writing, no materials will be ordered.
Possibly required drawing changes will be executed by the
factory within two weeks after receipt of a change request.
Final confirmation of the delivery date will only be possible after
the customer's final approval has been received. If change
requests are received the factory later than two weeks after
submittal of the approval drawings, the preliminary confirmed
delivery date will have to be revised.
Note:
This option causes a hold point in order processing.
If this option is selected, the standard drive delivery time will be
extended by approx. ten to twelve weeks.
P82
Separate transportation units
(transformer and power section)
With option
P82
, the drive is delivered as two separate transpor-
tation units.
Note:
Option
P82
is available for 6SR4... drives, 6.0 and 6.6 kV – and
for the power range below 2 MVA. Option
P82
must be ordered
for the power range above 2 MVA as well as for drives with article
number 6SR3
....
Q80 to Q85
Extension of liability for defects on drives
We provide you with the option of extending existing liability for
defect periods beyond the standard ones. The liability for defect
period listed in our standard terms and conditions is 12 months.
This can be extended as follows:
You can find the currently valid conditions for extending the
liability for defects period under:
Extension of liability for defects on drives
Additional identifi-
cation code
-Z
with order code
Additional text
Q80
Extension of liability for defects period by 12
months to a total of 24 months (2 years) from
delivery
Q81
Extension of liability for defects period by 18
months to a total of 30 months (2½ years) from
delivery
Q82
Extension of liability for defects period by 24
months to a total of 36 months (3 years) from
delivery
Q83
Extension of liability for defects period by 30
months to a total of 42 months (3½ years) from
delivery
Q84
Extension of liability for defects period by 36
months to a total of 48 months (4 years) from
delivery
Q85
Extension of liability for defects period by 48
months to a total of 60 months (5 years) from
delivery